How long does it take?

Typically, an average sized room will take one to one and a half days.

This can fluctuate subject to how the original chipboard/floorboards/joists were installed, the general logistics of the project, whether we have to strip back other tradesman’s work or if any areas require special attention. Certain rooms can also increase the time. For example, landings can be particularly time consuming due to the – often vast – amount of pipes and cable present.